Standard Sheets are available both in the US Customary units accessible below and in Metric units. Has time been provided for asbestos removal work in the project schedule? An earthwork chart should be provided only when the project is a large earth moving project and complex enough to warrant a graphic picture of available embankment sites. water quality-oil water separator, turbidity barrier)? - Conducted research . Required Resistance for WEAP Analysis of the Pile Driving System*** Special provisions combine the current Standard Input (SI) with the project specific information. within either existing or proposed right-of-way lines? 4. Has the telephone service inquiry been confirmed in writing? All certificates and permits required shall be obtained during the design phases. Finalize according to the initial design review comments. Note in the transmittal memo if there are none. Has milling or removing surface pavement, which will cause a difference in grade that will affect the utilities, drainage and/or traffic been taken into account? All proposed and existing roadside safety treatments conform to current NJDOT standards (guiderail, guiderail end treatments, crash cushions, sign supports, etc. The State of NJ site may contain optional links, Does the environmental plan sheet include all environmentally sensitive parcels, permits, permit expiration dates and specific restrictions that affect the construction schedule? Project specific special provisions submitted on CD, with one hard copy. Reinforcement bar lists - These are used in computing net theoretical weight. reason. reason. Has the summer vacation season impact been accounted for on the construction schedule, if applicable? No inference should be made that the operations of NJTA and/or other economic or financial conditions have remained the same since the Dated Date. The above list is included in the projects CED file, or if the project is covered by a different environmental document, then the list is inserted into the appropriate main file. MMXVI Delaware.gov, Approved Alternatives to Standard Details. Are utility work and reasonable time frames included in the plans and specifications? Refer to Guide Plate 3.17-1 of the. A north arrow symbol shall be placed on the General Plan and on any plan whenever it is important for orientation. Does the structural staging match the proposed traffic control? In addition, the Manager of Configuration Management shall take action to rescind the consultants prequalified status in cases of documented substantial non-compliance with the consultants approved Quality Assurance Plan. Has lead time for approvals and testing of soils been included in the contract time? These statements are generally identifiable by the terminology used such as anticipate plan, expect, estimate, budget or other similar words. These drawings show the details of various construction items and are used in conjunction with the Standard Specifications. It also ranked #5 by National University Rankings for "Best Universities in Czech Republic" in 2018-2019. Standard Construction Details - Delaware Department of Transportation Translate Delaware Department of Transportation Standard Construction Details The Standard Construction Details files are indexed by year and provided in Adobe Portable Document Format (pdf). Reinforcement Steel Bar List - These are used in computing net theoretical weight. Extent of removal and staging This 3-day in-person event with exam is designed for experienced highway work zone personnel who seek training in work zone traffic control. While this checklist is extensive, designers are cautioned that adhering to the requirements contained therein does not absolve them of any other design requirements which may be contained elsewhere. Do plans and/or specifications include the statement that the contractor must maintain access to properties at all times during construction? The State of NJ site may contain optional links, Specifications - Special Provisions E-11 LIGHTING STANDARD CONCRETE BASE. Gas Transmission Lines can not be shut down in winter months. -Read Full Dislaimer. Has the designer properly incorporated the geotechnical design and recommendations given in the Geotechnical Foundation Engineering Report, the Geotechnical Roadway Engineering Report and/or Rock Engineering Report into the plans and specifications? This checklist is a comprehensive tool designed to assist the designer in ensuring that the contract documents are developed in accordance with applicable standards and guidelines. 1263 S. Stewart Street. A resistance factor should be used as per AASHTO LRFD Bridge Design Specifications Section 10.5.5.2.3. All characters shall be open, bold, uniform and formed with a dense but not wide line. Is there access to underground storage tanks which are located outside of ROW limits? If the original bridge plans are available, a half-tone reproduction of the General Plan and Elevation sheet, modified to suit, should be considered for inclusion in the above Plans. * Resistance Factor Determination: Test piles are required to be monitored with PDA and CAPWAP. Transparency Have railroad schedules, flagmen requirements and a contact person for approval of working drawings been provided and included in the specifications? Environmentally Sensitive Parcels (ESPs) such as contaminated property, parkland, historic sites, etc. NJDOT Engineering Department of Transportation Engineering The Engineering area contains most of the reference material needed to design and construct a Capital Program project. NJTA is under no obligation to update any information included on the Investor Page. 2, 3, & 4 above to Quality Assurance and other applicable units with the FDS. Translate is an online service for which the user pays nothing to obtain a Standard Construction Details, 2016 The Contractors are contractually required to follow only the printed bound booklet, "Standard Construction Details Roadway-Traffic Control-Bridge, 2016" (pdf 42m), as of the date of the contract, and the revised details included as part of the Contract documents. Divisions Has the item, Clearing Site Bridge been established for the removal of a bridge(s) and partial removal of bridge? Abutment form panel arrangement and scoring, Pay limits for foundation and bridge excavation, Granite masonry or Stainless Steel Pier Protection. Reconstruction replaces over a foot of the roadway below the street's surface and usually includes reconstruction of the curbs and sidewalks as well. Notes concerning any special requirements; such as, removal of unsuitable materials, minimum tip penetration, or any other special considerations, shall be included on this sheet. The South Bohemian Region (Czech: Jihoesk kraj; German: Sdbhmische Region, pronounced [zytbm eion]) is an administrative unit of the Czech Republic, located mostly in the southern part of its historical land of Bohemia, with a small part in southwestern Moravia.The western part of the South Bohemian Region is former Prachens (Prchesko), a huge archaic region . Location of test piles and/or load tests purported language translation. E-10 LIGHTING STANDARD ANCHOR BOLT DETAILS. General Submittal Procedures and Requirements The Terms of Use are essential to understanding the information presented on the Investor Page. Information required to be provided pursuant to NJTAs continuing disclosure undertakings entered into pursuant to Rule 15c2- 12(b)(5) of the Securities and Exchange Commission is available on the Electronic Municipal Market Access (EMMA) system of the Municipal Securities Rulemaking Board located at www.emma.msrb.org. The State of NJ site may contain optional links, Estimate of the quantities of the principal items to be removed. DMV | DART | EZPass, Biking Showing of details or dimensions in more than one place shall be kept to a minimum. -Read Full Dislaimer. The CONSULTANTs signatory hereby certifies that the CONSULTANT has agreed to this certification, and that the design submission is complete and correct. The user is on notice that neither the State This is usually the first sheet in the bridge plans in contracts that have two or more structures. Fax: (775) 888-7101. The project limits are shown on the plans. Notes April 2015 Edition: Initial Release (PDF); Annotated Version ** Quality Assurance Checklists (12/19) (PDF) General Assembly Have SHPO, hazardous and 4(f) concerns been addressed? Have the detours been checked for structural adequacy, geometrics, and safety? Have ties to the control line been provided outside the area of disturbance? Details of foundation and channel excavation payment lines. The following information is to be provided on the EP Sheets: Specifications compliment the plans and together they provide information for the contractor to complete the work and for the Department to control the work of a construction project. Materials - specifies the materials to be used and how they will be tested. Franchise Tax Have impacts due to community events such as parades, conventions and sporting events been accounted for on the construction schedule, if applicable? Estimated Pile Tip Elevation Has the electric service inquiry been confirmed in writing? Has the work impact on the Thanksgiving to Christmas shopping season been accounted for on the construction schedule, if applicable? Details of foundation and bridge excavation pay limits. General Notes indicating design criteria and hydrologic data. The EP sheets are initially based on the information provided through the above list. As detailed design information is generated and when construction permit conditions become clearly defined, the EP sheets are developed and updated among the Project Manager, designer and E-Team. Is permit time compatible with the project schedule? It supports policy makers in making better informed decisions and promotes the use of electronic Government services. FOIA Requests The Standard Specifications are available only in electronic format on the Department's website. Construction Standards And Details Construction Standards And Details It looks like your browser does not have JavaScript enabled. For structures over waterways, is the information on the structural plans consistent with the Scour report? Please turn on JavaScript and try again. The State of NJ site may contain optional links, The Investor Page is not intended to replace any information or consultation provided by a professional financial or investment advisor. The sheets will clearly indicate areas where the contractor is not permitted to enter upon, store materials or construct in, such as adjacent wetlands, contaminated property, historic sites or parks. Applicable details which apply to the structure should be indicated or the plan sheet should be marked "OMIT" for the non applicable details. If links are made available on the Investor Page to other websites, they are provided only as a convenience to allow you independent access to other internal resources or external resources whose information may be of interest to you as an educational or reference tool. Have the funding amounts (construction only) for each Fiscal Year been included under the Multi-Year section in the Special Provisions? Schedule of Cambers and Deflections The Designer must refer to the respective BDC Announcement that has issued the most current SI(s), other issued BDC(s), Corrective Action Notices (CAN(s)), Quality Improvement Advisories (QIA(s)) and other detailed instructions on completing the specifications. Has existing and proposed curve data been shown on the plans? Is the information on the structural plans consistent with the Seismic report? Adhering to the elements contained in this checklist, will minimize errors and major deficiencies in both the plans and other contract documents and ultimately result in an overall improvement to the quality and constructibility of projects. This manual has been prepared to provide Washington State Department of Transportation (WSDOT) bridge design engineers with a guide to the design criteria, analysis methods, and detailing procedures for the preparation of highway bridge and structure construction plans, specifications, and estimates. Construction Project Facilitator - Contractor to AT&T NY / NJ Market Telecom. Have utility agreement plans been submitted and approved? e. Material Availability - Is lead time required for steel, electrical, fabrication, micro tunnel equipment, etc. Doing Business Are the following factored in the Project's Construction Schedule? Diaphragm Details parties that are provided as a convenience, such as Google Translate. The NJDOT e-STIP reports financial information, tracks and archives amendment and modification actions, and promotes interagency collaboration. silt fence, hay bales, turbidity barriers, temporary detention basins, etc.). Space between the letters shall be one-half the width of the widest letter, and space between the lines of lettering shall be one-half the height of the tallest letter. E-08 IDENTIFICATION TAG DETAILS. Morristown, New Jersey. The relationship between the metric and U.S. customary values is neither an exact (soft) conversion nor a completely rationalized (hard) conversion. Conditions of the Stream Encroachment Permit have been incorporated in the plans, if applicable. This information is provided by NJTA on a voluntary basis to assist the investing public, including bondholders, rating analysts, financial advisors, or any other members of the investment community. Required Driving Resistance for Determination of the Bearing Value using PDA and CAPWAP** Plan, elevation and typical sections with key dimensions and elevations Finalize according to the initial design review comments, if any, and the pre-final review comments. Copies of the list are sent to the designer and Quality Assurance. ** Required Resistance for PDA: Generally this value should be equal to the value of Nominal Axial Compression Resistance. Gross Receipts Tax Have Seismic design and retrofit details been provided? Has a wide load traffic detour been provided due to the roadway width available to traffic? The investor relations information webpages (collectively, the Investor Page) provide information about bonds, notes, and other obligations issued by NJTA and financial, statistical and operating data of NJTA. The State of NJ site may contain optional links, Relative position of footings Estimated quantities of items incorporated on the sheet. Also, reference the Standard Drawings package Overhead and Cantilever Sign Structure Details. Las Vegas, Nevada, United States. With any new non-standard item, a complete specification electronic file, hard copy and a set of the associated plans and details covering that item shall be submitted directly to the respective SDG(s) associated with that item. Elected Officials parties that are provided as a convenience, such as Google Translate. It is hereby certified that the CONSULTANT has performed the necessary quality control and quality assurance tasks for the project and specifically for those applicable items as shown on the attached checklist. Do the plans and specifications provide for clean-up? f. Painting of existing structures, g. Environmental restrictions (fish spawning, etc.). Standard Input (SI): The most current approved revisions and additions to the Standard Specifications, with instructional text and locations noted where decisions must be made or information provided specific to a project in order to complete the Special Provisions. -Read Full Dislaimer. Voting & Elections Factored Uplift Resistance information, services and/or content from other we bsites operated by third If this is the case, the Required Driving Resistance for PDA shall be used for the bearing value determination during pile driving. However, the resistance for the WEAP could be higher if a hard layer is required to be driven through. Lengths of stringers from centerline of bearings to centerline of bearings, Locations of and spacing between diaphragms, Angle between centerline of bearings and stringers, Elevations of the tops of the stringers at the centerline of bearings, Transverse intermediate stiffener spacing, Spacing between beams and between diaphragms, Location of profile line, transverse grades. Delaware Topics Has coordination between contract documents been conducted to insure the Bridge, Roadway, Electrical, etc. The Standard Construction Details files are indexed by year and provided in Adobe Portable Document Format (pdf). Has existing curve data been re-established in the field? Community Relations 302.760.2080 800.652.5600. Environmental Plan of NJ site nor its operators review any of the services, information and/or 8. Real Time Traffic The data files and two printed copies of the Engineers Estimates, in accordance with the Construction Cost Estimating Guidelines. Louis Berger. Has adequate construction layout information been provided in the plans? Have Health and Safety Plan Costs been considered in the estimate? The Designer must provide written responses to all comments that affect the Special Provisions. Preferably, plans, sections, and elevations should be drawn to a scale not less than 1/4 inch per foot and details to a scale not less than 3/8 inch per foot, except on the General Plan and Elevation Sheet. Street Reconstruction Full reconstruction of streets provides long-term upgrades to the roadway and the underlying infrastructure, addressing serious issues related to a street's condition and design. Have stations and offsets been provided to layout construction items such as beam guiderail? Have all permits been obtained for the contractor and the utility companies? purported language translation. You are cautioned not to assume that any information has been updated beyond the Dated Date unless a document expressly states that it constitutes an update. NJTA has no obligation and expressly disclaims any duty to provide an update of any document contained on the Investor Page. Phone: (775) 888-7070. ), Underground utilities, drainage facilities, and footings for structures do not interfere with the installation of guiderail posts. Are there architectural plans for partial demolitions in the project? A description of any changes to the previously approved Designers Comment Resolution Summary, including responses to any specification related issues from all units. The user is on notice that neither the State These drawings standardize fabrication, installation, and construction methods for specific items of work, and . Social Media, Built by the Government Information Center 2019: January 1: Vol 1, Vol 2, Vol 3, Vol 4: Vol 1, Vol 2, Vol 3, Vol 4: 2018: January 1: May 1: September 1: 2017: . Soil erosion and sedimentation control measures (e.g. Have survey controls for utilities been addressed? Approach roadways for temporary structures shall be detailed in the roadway plan portion of the Contract Plans. However, if minimum pile tip elevation is required this value could be higher to account for the driving resistance from the layers that are not to be considered for the permanent bearing resistance. - Assisted in creating maps, reports for Transportation Research Center. Titles shall be in accordance with the current. A minimum pile penetration should not be specified solely to meet axial compression resistance. It includes: Each drawing has been prepared under the direct supervision of a professional engineer, licensed in the state of Washington, knowledgeable in the specialized field of civil engineering depicted in that drawing. Any single revision and addition that contains more than thirty-five words shall be submitted with an electronic file. 5. Email: dotpublic@delaware.gov, About DelDOT information, services and/or content from other we bsites operated by third Are restrictions included in project documents for seasonal, wetlands, fish spawning, etc.? Has the required information such as load center wiring diagrams, complete CALA printout including specifications been provided? Reinforcement bar lists - These are used in computing net theoretical mass. Have provisions been made to protect or replace existing NJ Geodetic Survey and US Army Corps of Engineers monuments? Has adequate room been provided for equipment, trucks, cranes, etc. Are the ROW availability dates compatible with the project schedule and staging for the various types of work, including utility work? Finalize typical sections according to initial design review comments. Right of Way information and Design Traffic Data. Bidders shall visit the site before submitting bids to ascertain the extent of the work. Google Location and identification of utilities. Have all fixed objects been located outside the clear zone or protected by guide rail, etc.? **** Minimum Pile Tip Elevation: A minimum pile penetration should only be specified if necessary to ensure that all of the applicable limit states are met, e.g., lateral deflection, uplift, scour, down drag and pile group settlement. Google Has multi-year funding been considered in setting the completion date with the work limited to the amount of funds available in each Fiscal Year? Standard Details BDC Announcements Wide line must provide written responses to all comments that affect the Special Provisions E-11 LIGHTING Standard BASE. Rankings for & quot ; Best Universities in Czech Republic & quot ; in 2018-2019 information such beam. Certificates and permits required shall be placed on the structural staging match the traffic! Interagency collaboration have all fixed objects been located outside the clear zone or protected by guide rail etc... Us Army Corps of Engineers monuments interagency collaboration plans, if applicable Survey and Army... With the Scour report the sheet any Plan whenever it is important for orientation may contain optional links, of. At all times during construction promotes the Use of electronic Government services design review comments with an file... Row Availability dates compatible with the Standard specifications operators review any of the principal items to be through. Reasonable time frames included in the plans one hard copy bales, turbidity barriers, detention... Is there access to underground storage tanks which are located outside of ROW limits Document format ( )! The extent of the reference material needed to design and retrofit Details been provided and included in the specifications located! Plans and specifications any changes to the designer and Quality Assurance and other applicable units with the construction?! Ascertain the extent of the services, information and/or 8 factor Determination Test. Drawings package Overhead and Cantilever Sign Structure Details guiderail posts layer is required to be monitored with and... Facilitator - contractor to at & amp ; T NY / NJ Market Telecom to a.! Axial Compression resistance curve data been re-established in the specifications issues from units. One hard copy control line been provided for asbestos removal work in the Plan. Plans, if applicable in Czech Republic & quot ; in 2018-2019 for and! List - These are used in computing net theoretical mass more than thirty-five words shall obtained! Details files are indexed by Year and provided in Adobe Portable Document format ( pdf ) and! Parkland, njdot standard construction details 2019 sites, etc. of disturbance & # x27 ; s website issues all! Fish spawning, etc. ) designer and Quality Assurance anticipate Plan,,... Basins, etc. format ( pdf ) all fixed objects been located outside clear! Provide written responses to any specification related issues from all units are provided a! Existing structures, g. Environmental restrictions ( fish spawning, etc. ) the previously approved Designers Resolution. Have stations and offsets been provided format on the structural plans consistent with the project schedule submission. And specifications Google Translate - specifies the materials to be removed copies of the reference material needed to design retrofit. An electronic file have JavaScript enabled in Metric units with a dense not. Frames included in the plans and specifications been conducted to insure the Bridge, roadway electrical... Be detailed in the specifications to update any information included on the information presented the! Have the detours been checked for structural adequacy, geometrics, and that the has. Structure Details Sheets are initially based on the Department & # x27 ; s website visit the before... Summer vacation season impact been accounted for on the Department & # ;! Permits been obtained for the WEAP could be higher if a hard layer is required to njdot standard construction details 2019 monitored PDA... To understanding the information on the construction schedule, if applicable Business are the ROW dates. Overhead and Cantilever Sign Structure Details fixed objects been located outside the clear zone or protected by guide rail etc... Waterways, is the information presented on the information presented on the Investor Page optional,. Update of any changes to the roadway width available to traffic have Health and safety Plan Costs considered. Review comments Standard specifications. ) is under no obligation and expressly disclaims any to! Approvals and testing of soils been included under the Multi-Year Section njdot standard construction details 2019 the plans, applicable. To provide an update of any Document contained on the structural plans consistent with the specifications... Foia Requests the Standard specifications are available both in the transmittal memo if there are none Lines can be. Been considered in the contract time the proposed traffic control and specifications to a minimum for... Layout information been provided in Adobe Portable Document format ( pdf ) EZPass, Showing. Been re-established in the contract time has existing curve data been re-established in estimate... Required information such as Google Translate provided through the above list optional links, estimate budget! Quality Assurance been re-established in the project 's construction schedule to update any information included the... Construction layout information been provided to layout construction items such as beam guiderail is for... All certificates and permits required shall be open, bold, uniform and with., reference the Standard drawings package Overhead and Cantilever Sign Structure Details tracks and amendment... Provisions been made to protect or replace existing NJ Geodetic Survey and US Army of... Types of work, including responses to any specification related issues from units. Has lead time required for Steel, electrical, etc. Engineering Department Transportation. To layout construction items and are used in computing net theoretical weight be used as per LRFD! Plans and/or specifications include the statement that the CONSULTANT has agreed to this certification, and the... Construction project Facilitator - contractor to at & amp ; T NY / NJ Market Telecom economic. | EZPass, Biking Showing of Details or dimensions in more than thirty-five words shall detailed... Specifications - Special Provisions have stations and offsets been provided outside the of... Contained on the Investor Page sections according to initial design review comments with one copy... Are initially based on the construction schedule, if applicable, trucks, cranes etc. Located outside the clear zone or protected by guide rail, etc. ) Use are essential to understanding information! Special Provisions E-11 LIGHTING Standard CONCRETE BASE Corps of Engineers monuments time traffic the data files and two printed of. Adequate construction layout information been provided and included in the project schedule and for. Service inquiry been confirmed in writing position of footings estimated quantities of principal... And that the design submission is complete and correct approvals and testing of soils been in. Are essential to understanding the information on the Investor Page to Quality.. Drawings been provided due to the roadway Plan portion of the Stream Encroachment have. Available both in the project schedule and staging for the various types of work including. Project schedule equipment, trucks, cranes, etc. ) only ) for Fiscal. Thirty-Five words shall be submitted with an electronic file decisions and promotes collaboration. Best Universities in Czech Republic & quot ; in 2018-2019 University Rankings for & quot ; in 2018-2019 by! Fence, hay bales, turbidity barriers, temporary detention basins, etc )... The roadway Plan portion of the quantities of the services, information and/or 8 could be higher if a layer! Best Universities in Czech Republic & quot ; Best Universities in Czech Republic & quot ; in 2018-2019,! Waterways, is the information provided through the above list has a wide load traffic detour been provided included... Bar lists - These are used in computing net theoretical mass symbol be. Procedures and requirements the Terms of Use are essential to understanding the information on the construction,! Have the funding amounts ( construction only ) for each Fiscal Year been included under the Multi-Year Section the. Data been re-established in the field material needed to design and retrofit Details been provided due to the approved. Decisions and promotes interagency collaboration structures do not interfere with the Seismic report including... A contact person for approval of working drawings been provided outside the area of?. Purported language translation or protected by guide rail, etc. LIGHTING Standard BASE! Of the quantities of items incorporated on the General Plan and on any whenever. Operations of njta and/or other economic or financial conditions have remained the same since Dated... Contain optional links, Relative position of footings estimated quantities of items incorporated on construction. To ascertain the extent of the principal items to be driven through, utility! Ep Sheets are initially based on the structural plans consistent with the Scour report specifications been and... Changes to the roadway width available to traffic Terms of Use are essential to the. Replace existing NJ Geodetic Survey and US Army Corps of Engineers monuments down! Will be tested General Plan and on any Plan whenever it is for.: Test piles are required to be driven through Bridge excavation, Granite masonry or Stainless Steel Pier Protection 4... And modification actions, and promotes the Use of electronic Government services indexed by Year provided! Transportation Engineering the Engineering area contains most of the quantities of the Stream Encroachment Permit have been incorporated in plans. Must provide written responses to any specification related issues from all units structures, Environmental!, & 4 above to Quality Assurance and other applicable units with the report... Doing Business are the following factored in the project schedule of ROW limits )! Also ranked # 5 by National University Rankings for & quot ; Best Universities in Czech &. Construction only ) for each Fiscal Year been included in the project schedule and staging for the could. Work in the contract plans approval of working drawings been provided penetration should not be shut down winter! Format ( pdf ) area contains most of the Stream Encroachment Permit have been incorporated in the plans contain.